
St George Mining Ltd (ASX:SGQ, FRA:S0G, OTC:SGQMF) has delivered its thickest and most compelling drill result yet from the Araxá Rare Earths and Niobium Project in Brazil, with a standout intercept of 178.7 metres at 4.34% total rare earth oxides (TREO) and 0.75% niobium oxide (Nb₂O₅) from surface.
The result — the thickest mineralised interval recorded at Araxá to date — underscores the scale, grade and near-surface continuity of the deposit, reinforcing its status as one of the most significant undeveloped rare earths and niobium projects globally.
It forms part of a broader batch of assay results from 15 diamond drill holes, with multiple wide, high-grade intercepts continuing to demonstrate consistency across the system.
Oblique section showing the latest diamond drill holes as well as other significant drilling completed in the current campaign. The latest drill holes with red labels.
Among the highlights:
-
165.3m at 4.28% TREO and 0.61% Nb₂O₅ from surface
-
150.2m at 4.64% TREO and 0.59% Nb₂O₅ from surface
-
163.65m at 3.29% TREO and 0.45% Nb₂O₅ from surface
-
81.05m at 5.14% TREO and 0.64% Nb₂O₅ from surface
These results continue to highlight a defining feature of Araxá — very thick, high-grade mineralisation starting at surface, supporting the potential for a low-strip, open-pit mining operation.
Section A – A’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline.
Executive chairman John Prineas said the combination of scale and grade, particularly from surface, sets Araxá apart from comparable projects.
“The drilling results continue to show huge true widths from surface paired with very high grades,” he said.
“This unique combination is unrivalled among emerging rare earths and niobium developers,” he added. “The commercial advantage of high-grade mineralisation starting from surface — as opposed to 50 metres or even more than 100 metres below surface — cannot be underestimated.”
Section B – B’ showing high-grade TREO intercepts (cut-off 1% TREO) and high-grade Nb2O5 intercepts (cut-off 0.2% Nb2O5) along with the existing MRE outline, showing the expansion of the existing MRE.
High-grade system continues to expand
Drilling at Araxá has now been running continuously for more than six months, with the current program designed to both expand and upgrade the mineral resource estimate.
The latest results demonstrate strong grade continuity over broad intervals and suggest further upside, with the mineral system remaining open in all directions and at depth.
LATEST POSTS
- 1
Winona Ryder didn't take the 'Stranger Things' plot lightly. How 'otherworldly' grief and a kidnapping in her hometown informed her character. - 2
Independence from the rat race: How to Save and Contribute Shrewdly - 3
Opening Achievement: 8 Methodologies for Compelling Using time productively - 4
NASA's Artemis astronauts enter final preparations for Moon mission - 5
Spain’s Picos de Europa: What to see and do in ‘the world’s most beautiful place’
The Best 20 Photography Instagram Records to Follow
2025 Was Another Exceptionally Hot Year
Europe must reinvent warfare for ‘era of shocks,’ NATO’s Vandier says
Dental, Vision, and Hearing Inclusion in Senior Protection.
2026 Golden Globes live updates: Red carpet arrivals will kick off the night; Nikki Glaser set to host
Poll: Only 25% of Americans think Trump has 'followed through' on his promise to release the Epstein files
Doctor's orders? ‘Belly laugh at least two to five days a week'
Seven deaths possibly linked to malfunctioning glucose monitors
Asia's Noteworthy Destinations: A Voyager's Aide













